Satisfactory Planner
Geothermal Generator Satisfactory building icon

Geothermal Generator

Power

Harnesses geothermal energy to generate power. Must be built on a Geyser. Caution: Power production fluctuates. Power Production: Impure Geyser: 50-150 MW (100 MW average) Normal Geyser: 100-300 MW (200 MW average) Pure Geyser: 200-600 MW (400 MW average)

Power Consumption

0.0 MW

Clearance (W × L × H)

20 × 19 × 32

Somersloop Slots

0

Power Exponent

1.6000

Build Cost